Coastal Zone Advisory Committee · Tuesday, April 14, 2026
Coastal Zone Advisory Committee
St. Charles Parish Informer · Meeting coverage · 12:00 PM · Council Chambers, Courthouse
Meeting Summary
The St. Charles Parish Coastal Zone Advisory Committee reviewed twelve Joint Permit Applications for canal maintenance, pipeline work, and soil testing across the parish, with most receiving exemption, no-direct-significant-impact, or coastal-use-permit determinations. The committee also continued its multi-month review of Environmental Management Units (EMUs) within the parish's Local Coastal Program, discussing freshwater siphon proposals for the Labranche Wetlands and reviewing land-use data for the Almonaster Wetlands, while introducing three new EMUs for study before the next meeting. Members also heard a recap of their recent trip to Coastal Day at the state capitol and discussed ongoing concerns about freshwater flows through Davis Pond.
Decisions & Votes
ApprovedP20260156ADM
Joint permit application, local program
The application received a determination of exemption because the site is five feet or higher in elevation and located within upland habitat. The permit has already been issued.
ApprovedP20260152
BKV Corporation geotechnical soil borings
BKV Corporation proposed drilling geotechnical soil borings and cone penetration tests at proposed pipeline crossing locations to assist in design and permitting of a pipeline project. The determination was exemption.
ApprovedP20260169
Shell facility pile replacement maintenance project
Shell proposed to demolish and replace timber pipe rack pilings at an existing facility with steel piles because the timber piles have reached the end of their design lifespan. The determination was exemption as a maintenance project.
ApprovedP20260191
GIS Engineering soil borings and cone penetration tests
GIS Engineering, coordinating with EUSIS Engineering, proposed cone penetration tests and soil borings on a property site. The determination was no direct or significant impact.
ApprovedP20260228
St. Charles Parish Public Works vegetative debris removal from canal
St. Charles Parish Public Works proposed annual vegetative debris removal from canals on the western side of the parish, clearing approximately 11,952 cubic yards over five years to maintain water flow and drainage. The determination was a coastal use permit.
ApprovedP20260234
St. Charles Parish Public Works canal cleaning
St. Charles Parish Public Works proposed to clean and rake a discharge canal annually to maintain proper surface water flow, with no dredging or widening involved.
ApprovedP20260242
St. Charles Parish Public Works vegetative debris removal from east and west canal
St. Charles Parish Public Works proposed to clear vegetative debris from canals near the railroad tracks to a pump station outfall on an annual basis to maintain water flow and drainage. The determination was a coastal use permit.
ApprovedP20260245
St. Charles Parish Public Works vegetative debris removal from Cotton Canal
St. Charles Parish Public Works proposed removal of vegetative debris from the Cotton Canal, clearing approximately 8,952 cubic yards over five years to maintain water flow and drainage. The determination was a coastal use permit.
ApprovedP20260252
St. Charles Parish Public Works Cortez Canal cleaning
St. Charles Parish Public Works proposed to clean and rake the Cortez Canal annually to maintain proper surface water flow to a pump station for the life of the permit.
ApprovedP20260254
Phillips 66 pipeline repair
Phillips 66 proposed a pipeline repair on an existing 14 inch pipeline to comply with federal transportation regulations, involving approximately 113 cubic yards of excavation. The determination was exemption.
ApprovedP20260258
Cathodic protection deep well anode installation on Norco Avondale line
A proposal to install a cathodic protection deep well anode on a six inch line between Norco and Avondale, requiring approximately 19 cubic yards of excavation. The determination was no direct or significant impact.
deferredP2026-0073
Filling of swamp land for residential use
A private party is filing to fill swamp land with recycled concrete and sand for future residential use near East Harding heading toward Airline. The recommendation is a coastal use permit but the report has not been finalized pending additional planning review.
Watch Items
- P20260073 (Karvon Mitchell, Coastal Use Permit): A public hearing opened a 25-day comment period on a proposal to fill swamp land with recycled concrete and sand for future residential use. Staff have not finalized their recommendation because the applicant is still coordinating with parish planners, so this item will return for further action.
- EMU 7 (Labranche Wetlands): The committee is tracking two proposed freshwater siphon projects near the Bonnet Carre Spillway, one directing water into the land bridge and one into Bayou Labranche. No decision has been made by the Coastal Protection and Restoration Authority (CPRA); a second solicitation period for the state's 2029 Coastal Master Plan is expected this summer, and members asked about bringing in a guest speaker for a future update.
- EMU 11 (Almonaster Wetlands): Staff agreed to research and report back on why cypress and swamp forest regrowth has been especially successful in this area, to see if lessons can be applied elsewhere.
- EMUs 2, 3, and 4 (Norco Wetlands, East LaPlace Wetlands, and the Bonnet Carre Spillway): These were introduced for committee review and will be discussed in detail, including possible revisions, at the next meeting. A member also raised concerns about the lack of revegetation on levees along I-10 and asked staff to look into whether replanting plans exist.
- Staff agreed to confirm and report back on whether the parish's canal-clearing maintenance work is required to go out for public bid.
- The Davis Pond Advisory Committee will hold a semi-annual meeting on June 23 covering both Davis Pond and Caernarvon diversions; the committee discussed preparing a report in advance.
- Members were urged to contact state wildlife and fisheries officials to support maintaining at least a 4,000 cubic-feet-per-second flow through Davis Pond to protect the upper estuary, amid pushback from commercial fishermen.
- Upcoming dates flagged for residents: the CPRA Board Meeting on April 15, the parish's Trash Bash cleanup, the Fishing Rodeo on May 9, and a fall waterway cleanup being organized with Keep Louisiana Beautiful (date still being finalized).
Published August 13, 2026